Stainless Steel 316 Type Strapp Banding

FOB Reference Price:Get Latest Price
US $5.8-16.5 / Roll | 100 Roll/Rolls (Min. Order)
Supply Ability:
5000000 Carton/Cartons per Month
Port:
Ningbo/Shanghai
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
SDHY
Model Number:
SDHY-Band series
Material:
Stainless Steel
Packaging & Delivery
Packaging Details
Carton packaging, plastic box optional can also be packaged according to customer requirements.
Delivery Time
5-7 days received the payment
Product Description

Stainless Steel 201/304/316 Series Banding

 Product Features:

1. Material: Stainless Steel 201,304,316 .
2. Specification:Width:6mm-25mm;Thickness:0.2mm-1mm;Length:30m/roll, 30.5mm/roll, 50m/roll.
3. Packing: carton packaging, plastic box optional Can also be packaged according to customer requirements.
4. Application:It is widely used in various fields (petrochemical, bridges, pipelines, cable tray, traffic facilities, billboards, electric power facilities, etc.).

Product Name
Stainless Steel Banding/ Strapping 
Material
SS 201/304/316
Gade
201/304/316
Thickness
0.38~0.76mm
Length
30m/roll, 30.5mm/roll, 50m/roll or As customer's requirement
Technique
Cold Rolled
Technical treatment
Cold Rolled
Edge
Round Edge
Surface
Polished
Application
Industrial field
Certification
ISO9001
Detailed Images
Product Parameters
Application

1.How to Usage

1. First,thread the banding through buckle and bend round. 

2. Place banding around application, thread through the buckle, pull and then bend.
3. Thread banding through the tensioner, apply the grip and roatate the bar to tension.
4. Once enough tension is applied push the tool towards the buckle.
5. Pull the blue lever to cut the band.
6. Gently hammer down the band into the buckle.
7. After, hammer down the two lugs on the buckle.
8Lastly,According to the method used above.

2.Application Display

Our product is Widely used in life.

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Packing & Delivery

Packing Details  :30m/roll, 30.5m/roll, 50m/roll, carton packaging(plastic box optional ).

Delivery Details : 5-7 days received the payment.

1. Special logistics packaging one
2. Special logistics packaging two
3. Delivery scene one
4. Delivery scene two
5. Delivery scene three
6. Delivery scene four
Related Products
FAQ

Q: Are you trading company or manufacturer ?

A: Both.

Q: How long is your delivery time?

A: Generally it is 1-5 days if the goods are in stock. or it is 5-10 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?

A: We accept TT, 30% deposit and 70% before shipment, Western Union, L/C at sight is ok!

Q: Tell me the standard of package?

A: For the small capacity, it's used carton.

Q: Could you offer form A or C/O?

A: It's totaly not a problem, we can prepare ralative documents to forgin affairs office or other office to apply for this certification.

Q: Would you accept to use our Logo?

A: Yes, If you have a good quantity, it's absolutely no problem to do OEM.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like